We had been slowly replacing the old rigging, piece by piece, and finally changed out the final pieces — the upper shroud tangs and through bolt (including clevis pins and cotters). We are down to the short list now. This will include replacing the aluminum fuel tank (PSC switched to fiberglass some years back when problems with the aluminum tanks developed) and getting some engine parts swapped out (the impeller is at least four years old, the mixing elbow is probably 11 years old, etc.). There are also a lot of small projects we need to accomplish. We will post pictures to this page as we get these things done, along with other happenings.
We will really miss our friends at Ventura West Marina. Though we’ve only known them the short time it’s taken to get the boat ready for sea, they’ve become friends for always. Each has contributed in important ways to the success of our project. We will never forget them.